Employment Permit Processing Times in Ireland
Current DETE Dates for Employers

The dates DETE has actually reached, by permit type — which queues are moving, which have slipped, and what today’s figures mean for the day your new hire walks on site.

Last updated: 15 September 2026 DETE's figures as of 11 September 2026, checked by us on 15 September 2026.

Current DETE processing dates

These are the dates DETE reached in each queue as of 11 September 2026 — DETE’s own most recent stamp, which we read on 15 September. Read them as: "if you submitted a completed application on this date, yours is the one being decided now."

Application typeNow deciding applications received onWait at that dateMovement since 8 May 2026
Critical Skills Employment Permit (new)3 September 2026~1 weekMoved forward — 2 weeks faster
New General Employment Permit6 August 2026~5 weeksNo May baseline — see note
All other new applications (excl. CSEP, GEP, ICT)21 July 2026~7.5 weeksMoved forward — 1.5 weeks faster
Intra-company transfer (new)8 September 20263 daysMoved forward — 5 weeks faster
Intra-company transfer (renewal)23 June 2026~11.5 weeksSlipped — 1 week slower
All renewal applications22 June 2026~11.5 weeksSlipped — 1 week slower
Reviews / appeals24 January 2026~33 weeksSlipped — 11 weeks slower

Source: DETE, Current processing dates for employment permits — DETE's figures as of 11 September 2026, checked by us on 15 September 2026. "Wait at that date" is the calendar gap between the published date and DETE's own as-of date, which is how the May baseline was measured too. DETE published no separate General Employment Permit line in May, so that row has no like-for-like baseline. Movement compares against DETE's own published position as of 8 May 2026, from the Internet Archive capture of 10 May 2026 — the last capture of that page before our August read. Verify the live figures on DETE's own page.

What moved, what stalled, what slipped

DETE publishes the dates. It does not tell you which direction they are heading. That is the part that decides whether you can promise a candidate a start date, so we track it.

The headline: every first-time permit queue is now ahead of where it was in May; renewals and appeals are still behind. The intra-company transfer queue has moved on every DETE update since mid-August and, at three days, is now the shortest wait on the table.

What this means for your hire

The processing date is one stage of five. Here is what today's dates translate into if you start the process now, in September 2026.

If your role needs a General Employment Permit

Care assistants, chefs, construction trades, farm and meat-processing operatives, HGV drivers.

Add those up and the arithmetic lands on a start date around late January or February 2027 — roughly five months. We tell employers to plan for six to eight months, which puts a realistic first day between March and May 2027. The gap between the two is not padding, and the section below explains exactly where it goes.

If your role qualifies for a Critical Skills Permit

Nurses, doctors, engineers, certain IT roles — anything on the Critical Skills Occupations List.

No Labour Market Needs Test, and a decision queue currently running at about a week. Submit in early October, expect a decision inside a fortnight, then four to eight weeks for the visa. Plan for three to five months — a first day between December 2026 and February 2027. Same worker, same country, three months earlier, purely because of the permit type.

If you have a permit coming up for renewal

This is the one that quietly bites. The renewal queue is sitting on 22 June 2026 — about eleven and a half weeks. It has been moving forward since mid-August, but it is still about a week slower than it was in the spring.

Apply today and, if the queue holds at eleven and a half weeks, a decision lands around the first week of December 2026. This queue has swung in both directions in four months, so we add a margin: if a worker's permit expires before mid-December 2026 and you have not applied yet, you are already inside the queue's own wait. You can apply to renew a General Employment Permit up to four months before it expires. At the current pace, use every week of that.

Why we say six to eight months when the arithmetic says five

You will see shorter numbers quoted elsewhere — four to six months is common. Those figures are not wrong; they are the sum of the published stages with nothing going sideways. We quote six to eight months because in practice something usually does.

The time that is missing from the arithmetic:

So: six to eight months for a General Employment Permit hire, three to five for Critical Skills. That is the figure we plan against and the figure we quote in a proposal. If today's dates hold and nothing slips, you may well beat it. We would rather you were early than disappointed.

There is no fast-track queue — and no Trusted Partner stream

DETE publishes one queue per application type and works through it in date order of receipt of the fully completed form and fee. There is no second, faster column on that table for any category of employer, and no registration you can now apply for that would put you in a different queue.

The Trusted Partner Initiative no longer exists as a separate registration. Every employer now holds a portal account with current Revenue and CRO details, and DETE states that because all employers must submit Revenue documentation and a CRO number to maintain that account, there is no longer a requirement for a separate Trusted Partner Initiative. What the scheme used to give you comes as standard. DETE's own General Employment Permit and Critical Skills pages still describe an application being placed in a queue "depending on the Employer type, that is, Trusted Partner or Standard". We can't reconcile that with the Trusted Partner update above, and DETE publishes only one date per application type — so if employer type still affects your position, DETE does not publish it. Either way, there is no registration open to you that would change it.

The lever you do control is the date on your application. Your place in the queue runs from the day DETE holds a fully completed form and the fee — so anything sent in short of a document is not holding the date you think it is.

How CA Recruitment keeps your hire on track

We track these dates against your live application and tell you when they move. We run candidate sourcing in parallel with the Labour Market Needs Test so the 28 days are not dead time. We prepare the application to go in complete, because a returned file costs you your queue position and, at current appeal times, a refusal costs you the better part of a year. And we give you a start date you can repeat to your candidate without having to walk it back.

Monette is Filipino, based in Ireland, and has run this process from both ends. No recruitment fee is payable until your worker starts.

For the full stage-by-stage explanation of how these dates fit into the wider hiring journey, read our detailed employer guide to permit processing times.

Want a realistic start date for your role?

Send Monette the job title and county. We'll tell you which permit applies, what today's dates mean for it, and when your worker could realistically start.

Frequently asked questions

As of 11 September 2026, DETE is deciding New General Employment Permit applications received on 6 August 2026 — a wait of about five weeks — and Critical Skills Employment Permit applications received on 3 September 2026, about a week. Those are decision-queue waits only. The full hire, including the Labour Market Needs Test beforehand and the visa and travel afterwards, runs six to eight months for a GEP and three to five for a Critical Skills permit.

It depends on the queue. Since May 2026, every new-application queue has moved forward — Critical Skills from about three weeks to about a week, intra-company transfers from five weeks to three days — while renewals have slipped from about ten and a half weeks to eleven and a half, and reviews and appeals from twenty-two weeks to about thirty-three. Renewals have kept edging forward since mid-August; reviews and appeals have not moved since DETE's 31 August update. Neither is back to where it stood in May.

As of 11 September 2026, DETE is processing renewal applications received on 22 June 2026 — about eleven and a half weeks. The queue has been moving forward since mid-August, but it is still about a week slower than it was in the spring. You can apply to renew a General Employment Permit up to four months before it expires. If a worker's permit runs out before mid-December 2026 and you have not applied, start now.

No. DETE publishes one queue per application type and processes it in date order of receipt of the fully completed form and fee — there is no separate Standard and Trusted Partner stream on the published dates. The Trusted Partner Initiative no longer exists as a separate registration — DETE states that because all employers must submit Revenue documentation and a CRO number to maintain a portal account, there is no longer a requirement for a separate Trusted Partner Initiative.

Starting in September 2026 on a General Employment Permit, a realistic first day is March to May 2027 — the 28-day Labour Market Needs Test, about five weeks in the DETE queue, four to eight weeks for the D-visa, then travel and registration. For a Critical Skills role there is no Labour Market Needs Test and the queue is about a week, so December 2026 to February 2027 is realistic.

No one can. What we do is stop you losing time everywhere else: a complete application that isn't returned for corrections, a Labour Market Needs Test run correctly the first time, sourcing that happens during the 28 days rather than after them, and the visa lined up to follow the permit. With appeals now running around thirty-three weeks, getting it right first time is the whole game.

Start the conversation. No commitment required.

For a realistic timeline on your specific roles, WhatsApp Monette on 089 416 6124. Free eligibility check.

Call: +353 89 416 6124 WhatsApp Monette