Current DETE processing dates
These are the dates DETE reached in each queue as of 17 November 2026 — DETE’s own most recent published stamp. Read them as: "if you submitted a completed application on this date, yours is the one being decided now."
| Application type | Now deciding applications received on | Wait at that date |
|---|---|---|
| Critical Skills Employment Permit (new) | 23 October 2026 | ~3.5 weeks |
| New General Employment Permit | 17 October 2026 | ~4.5 weeks |
| All other new applications (excl. CSEP, GEP, ICT) | 17 October 2026 | ~4.5 weeks |
| Intra-company transfer (new) | 22 October 2026 | ~3.5 weeks |
| Intra-company transfer (renewal) | 30 September 2026 | ~7 weeks |
| All renewal applications | 30 September 2026 | ~7 weeks |
| Reviews / appeals | 6 May 2026 | ~28 weeks |
Source: DETE, Current processing dates for employment permits — DETE's figures as of 17 November 2026, checked by us on 17 November 2026. "Wait at that date" is the calendar gap between the published date and DETE's own as-of date. Verify the live figures on DETE's own page.
What moved, what stalled, what slipped
DETE publishes the dates. It does not tell you which direction they are heading. That is the part that decides whether you can promise a candidate a start date, so we track it.
The headline: on DETE's 17 November stamp, a Critical Skills application and a new intra-company transfer both wait about three and a half weeks. A new General Employment Permit waits about four and a half weeks, and a renewal about seven weeks. Reviews and appeals are being decided from 6 May.
- Critical Skills — still the fastest first-time queue. Between DETE's 5 and 13 October stamps it cleared eight days of applications in eight days of calendar, so the wait held at a week. On DETE's 17 November stamp it was deciding applications received on 23 October, a wait of twenty-five days, about three and a half weeks. It remains the strongest argument there is for checking whether your role qualifies for the Critical Skills route before defaulting to a GEP.
- New General Employment Permits — about four and a half weeks. DETE did not publish a separate GEP line in May; it sat inside a combined "all new applications except Critical Skills" row with a nine-week wait, so there is no like-for-like May figure for this row. It had held at about five weeks on every stamp we read from early August, then advanced only three days in the week to 28 September and six in the week to 5 October, taking the wait to forty days. The 13 October stamp cleared thirteen days in eight and brought the wait back to thirty-five days — five weeks. The two slow weeks did not become a trend. On DETE's 17 November stamp the queue stood at 17 October, a wait of thirty-one days, about four and a half weeks. This is the queue most of our clients' roles sit in, so it is the one we will be watching.
- All other new applications — moving in jumps. It sat on 21 July on every DETE stamp we read from 19 August to 21 September, and its wait stretched from about four weeks to nine with nothing cleared. DETE's 28 September stamp moved it to 13 August, twenty-three days cleared in seven. It held there on 5 October, and the 13 October stamp moved it only six days, to 19 August. On DETE's 17 November stamp it stood at 17 October, a wait of thirty-one days, about four and a half weeks. This queue moves in jumps, not steadily.
- Intra-company transfers (new) — about three and a half weeks. Flat at five weeks from May right through mid-August, then it moved: 13 July on DETE's 19 August stamp, 7 August on 31 August, 8 September on 11 September, 16 September on 21 September, 21 September on 28 September, 1 October on 5 October, 12 October on 13 October, where it held on 15 October, 14 October on 20 October and 20 October on 23 October. On DETE's 17 November stamp it stood at 22 October, a wait of twenty-six days, about three and a half weeks.
- Renewals — about seven weeks. Our 19 August reading had the queue on 11 May, DETE's 31 August stamp had it on 3 June, 11 September on 22 June, 21 September on 29 June and 28 September on 3 July — the last two of those clearing less than a week of applications per week, so the wait grew. The 5 October stamp put it on 13 July and the 13 October stamp on 23 July — ten days cleared each time, bringing the wait down from about twelve and a half weeks to just under twelve. The 15 October stamp, two days later, moved general renewals four days to 27 July and intra-company transfer renewals five days to 28 July, so both waits were then about eleven and a half weeks. The 20 October stamp moved general renewals four more days, to 31 July, and intra-company transfer renewals seven, to 4 August: waits of about eleven and a half weeks and about eleven. The 23 October stamp moved general renewals six days and intra-company transfer renewals two, which put both on 6 August, a wait of about eleven weeks. On DETE's 17 November stamp general renewals and intra-company transfer renewals both stood at 30 September, a wait of forty-eight days, about seven weeks. This is the line that catches employers out, and it is covered below.
- Reviews and appeals — moving slowly. Twenty-two weeks in May and about thirty-three at the start of September, before DETE's 21 September stamp cleared eighty days of this queue in ten days of calendar and brought it to 14 April 2026. It then sat on 14 April for three stamps while the wait grew from about twenty-three weeks to twenty-five. The 13 October stamp moved it to 28 April, fourteen days cleared in eight. On DETE's 17 November stamp it still stood at 6 May, a wait of about twenty-eight weeks. That is still a long time to wait for a decision you should not have needed. A refused application is still not something you appeal and expect back quickly.
What this means for your hire
The processing date is one stage of five. Here is what today's dates translate into if you start the process now.
If your role needs a General Employment Permit
Health care assistants, experienced chefs, almost all construction occupations, dairy and pig farm assistants, and HGV drivers with a CE or C1E licence.
- Role definition, salary check and the 28-day Labour Market Needs Test — you cannot apply until the 28 days are complete.
- DETE decision queue at today's pace, about four and a half weeks.
- A long-stay employment visa, if the worker needs one to travel to Ireland.
- Travel, arrival, IRP registration and onboarding — a further one to two weeks.
The section below explains how long we tell employers to plan for, and why.
If your role qualifies for a Critical Skills Permit
Doctors, engineers, certain IT roles — anything on the Critical Skills Occupations List.
No Labour Market Needs Test, and a decision queue currently running at about three and a half weeks. Apply now and, if that pace holds, the decision comes in about three and a half weeks. The visa follows it. Same worker, same country, three months earlier, purely because of the permit type.
If you have a permit coming up for renewal
This is the one that quietly bites. The renewal queue is sitting on 30 September 2026 — about seven weeks.
Apply today and, if the queue keeps its current pace, the decision lands about seven weeks later. This queue has swung in both directions in four months, so we add a margin: if a worker's permit expires before mid-February 2027 and you have not applied yet, you are already inside the queue's own wait. You can apply to renew a General Employment Permit up to four months before it expires. At the current pace, use every week of that.
Why we say about six months when the stage-by-stage arithmetic is shorter
You will see shorter numbers quoted elsewhere — four to six months is common. Those figures are not wrong; they are the sum of the published stages with nothing going sideways. We quote about six months, the top of that range, because in practice something usually does.
The time that is missing from the arithmetic:
- Embassy appointment availability. The four-to-eight-week visa window starts when the application is lodged, not when the permit lands. Appointment slots in Manila are not available on demand.
- Document gathering. Qualifications, references, police clearance and medicals sit with the candidate, in another country, on another timezone.
- Candidate notice periods. Good candidates are usually employed. Four to eight weeks of notice is normal.
- Returned applications. A missing document or a salary below the legal floor sends the file back, and you lose your place in the queue. With appeals running at about twenty-eight weeks, an appeal is a slow way back from a refusal.
So: about six months for a General Employment Permit hire, three to five for Critical Skills. That is the figure we plan against and the figure we quote in a proposal. If today's dates hold and nothing slips, you may well beat it. We would rather you were early than disappointed.
There is no fast-track queue — and no Trusted Partner stream
DETE publishes one queue per application type and works through it in date order of receipt of the fully completed form and fee. There is no second, faster column on that table for any category of employer, and no registration you can now apply for that would put you in a different queue.
The Trusted Partner Initiative no longer exists as a separate registration. Every employer now holds a portal account with current Revenue and CRO details, and DETE states that because all employers must submit Revenue documentation and a CRO number to maintain that account, there is no longer a requirement for a separate Trusted Partner Initiative. What the scheme used to give you comes as standard. DETE's own General Employment Permit and Critical Skills pages still describe an application being placed in a queue "depending on the Employer type, that is, Trusted Partner or Standard". We can't reconcile that with the Trusted Partner update above, and DETE publishes only one date per application type — so if employer type still affects your position, DETE does not publish it. Either way, there is no registration open to you that would change it.
The lever you do control is the date on your application. Your place in the queue runs from the day DETE holds a fully completed form and the fee — so anything sent in short of a document is not holding the date you think it is.
How CA Recruitment keeps your hire on track
We track these dates against your live application and tell you when they move. We run candidate sourcing in parallel with the Labour Market Needs Test so the 28 days are not dead time. We prepare the application to go in complete, because a returned file costs you your queue position and, at current appeal times, a refusal costs you months you cannot get back. And we give you a start date you can repeat to your candidate without having to walk it back.
Monette is Filipino, based in Ireland, and has run this process from both ends. No recruitment fee is payable until your worker starts.
For the full stage-by-stage explanation of how these dates fit into the wider hiring journey, read our detailed employer guide to permit processing times.
Want a realistic start date for your role?
Send Monette the job title and county. We'll tell you which permit applies, what today's dates mean for it, and when your worker could realistically start.
Frequently asked questions
As of 17 November 2026, DETE is deciding New General Employment Permit applications received on 17 October 2026 — a wait of about four and a half weeks — and Critical Skills Employment Permit applications received on 23 October 2026, a wait of about three and a half weeks. Those are decision-queue waits only. The full hire, including the Labour Market Needs Test beforehand and the visa and travel afterwards, runs about six months for a GEP and three to five for a Critical Skills permit.
It depends on the queue. Reviews and appeals were running at about thirty-three weeks in early September; DETE's 21 September update cleared eighty days of that queue, it then sat still for three updates, and the 13 October update cleared another fourteen days. On DETE's 17 November stamp the wait stood at about twenty-eight weeks, and new General Employment Permits were at about four and a half weeks.
As of 17 November 2026, DETE is processing renewal applications received on 30 September 2026 — about seven weeks. You can apply to renew a General Employment Permit up to four months before it expires. If a worker's permit runs out before mid-February 2027 and you have not applied, start now.
No. DETE publishes one queue per application type and processes it in date order of receipt of the fully completed form and fee — there is no separate Standard and Trusted Partner stream on the published dates. The Trusted Partner Initiative no longer exists as a separate registration — DETE states that because all employers must submit Revenue documentation and a CRO number to maintain a portal account, there is no longer a requirement for a separate Trusted Partner Initiative.
That depends on the permit type. Further up, this page explains how long we tell employers to plan for in total. For a Critical Skills role there is no Labour Market Needs Test, and the queue is about three and a half weeks.
No one can. What we do is stop you losing time everywhere else: a complete application that isn't returned for corrections, a Labour Market Needs Test run correctly the first time, sourcing that happens during the 28 days rather than after them, and the visa lined up to follow the permit. With appeals still running around twenty-eight weeks, getting it right first time is the whole game.